Resources · orders, freight and cost
Importing plywood from Vietnam guides: terms, transit days and landed cost by the 40HC
Importing plywood from Vietnam guides start with one fact: a 40HC of Truc Mai plywood is quoted FOB Hai Phong, CFR or CIF. Production takes 15–45 days after a 30% deposit, the sea leg takes 30–40 days to Northern Europe or 35–45 to the US East Coast, and the 70% balance is paid against the scanned B/L. Freight cost per m³ then depends on the core, because Styrax loads about 53 m³ and Eucalyptus about 43.
This hub is for buyers planning monthly containers. It follows one order from RFQ to unloading, gives the days at sea by region, and shows why the same freight rate costs more per m³ on a heavier core. The full terms sit on the MOQ, payment and FOB page; this page does not repeat them in other words.

- 15–45 daysproduction after the 30% deposit
- 30–40 daysHai Phong to Northern Europe at sea
- 35–45 daysHai Phong to the US East Coast at sea
- 53 vs 43 m³18 mm Styrax and Eucalyptus per 40HC
Transit days are typical ranges and vary by carrier and route. Load figures are planning figures.
Answer and key facts
Importing plywood from Vietnam guides: what a monthly container costs and how long it takes
Four numbers frame a Truc Mai container order: a minimum of one 40HC, 15–45 days of production after the deposit, a sea leg of 5 to 50 days depending on the region, and a landed cost that follows m³ per container. Everything else is the specification.
Prices are quoted per order against the written specification and are not published as a list. What a buyer can compute before asking is the freight share: container freight is charged per box, so it is divided by the m³ the box holds. That is why core choice is a cost line and not only a quality line.
Rules behind the paperwork lines: Regulation (EU) 2023/1115, readable on EUR-Lex, FSC International for the claim on the invoice, and the California Air Resources Board with the US EPA for US-bound panels.
| Line | Truc Mai order |
|---|---|
| Minimum order | One 40HC; one or two products usually, three to six by agreement |
| Production | 15–45 days after the 30% deposit |
| Balance | 70% against the scanned B/L, T/T or irrevocable L/C at sight |
| Delivery terms | FOB Hai Phong, CFR (CNF) or CIF |
| Samples | Free for repeat buyers and buyers with an order; new buyers book their own courier, credited against a real order |
Sequence
From RFQ to unloading: the order in seven steps
The sequence is the same for every container, which is what makes the second and twelfth container faster than the first. Documents and certificates are ready before the order is confirmed.
- RFQ with a written specification
Core, thickness, sheet size, face and back grade, emission class, packing and quantity. The reply gives sheets, m³ and packs per 40HC.
- Samples and an approved reference
Face grade is agreed against the approved sample and written on the order as a pair, face and back.
- Order and 30% deposit
Certificate files are sent before the order is confirmed.
- Production
Time depends on quantity, production conditions and agreement; 4 mm panels can take longer because good thin veneer is scarce.
- Loading and sealing
Packs are built, weighed and loaded; draft shipping documents go to the buyer for approval after loading.
- Scanned B/L and 70% balance
Paid by T/T or irrevocable L/C at sight.
- Sea leg and arrival
Days at sea depend on the region; the buyer checks the container against the reference sample on arrival.

Transit
Importing plywood from Vietnam to USA and Europe: how many days at sea from Hai Phong?
Typical days at sea run from 5 to 12 within South-East Asia up to 35 to 50 to West Africa. Northern Europe takes 30–40 days and the US East Coast 35–45. Carrier, route and transshipment change the figure, so treat the table as a planning range.
Importing plywood from Vietnam to the USA takes 20–30 days at sea to the West Coast and 35–45 to the East Coast, and plywood shipping cost from Vietnam to USA follows the same container maths as every other route. Add the production period to get the time from order to port of discharge. A buyer who orders monthly staggers deposits so that one container is at sea, one is in production and one is being specified.
| Region | Days at sea |
|---|---|
| South-East Asia | 5–12 |
| Middle East | 15–25 |
| US West Coast | 20–30 |
| Mediterranean (for example Valencia) | 25–35 |
| Northern Europe (for example Hamburg, Antwerp) | 30–40 |
| US East Coast | 35–45 |
| West Africa | 35–50 |

Cost
Plywood shipping cost from Vietnam to USA: how core choice changes freight per m³
Container freight is a price per box. Divide it by the m³ in the box and a denser core costs more per m³: at 18 mm a Styrax load of about 53 m³ carries each m³ for less freight per m³ than Acacia (about 47 m³) or Eucalyptus (about 43 m³).
The saving comes from weight. Eucalyptus reaches the 28,000 kg planning payload at 15 packs and Acacia at 16, while Styrax fills the container at 18 packs. A furniture buyer who moves from Acacia to Styrax core usually also gets a better face and a lighter sheet. A worksheet is easy to build: freight quote divided by 53, 47 and 43 gives cost per m³ for each core, before duty and port charges.
Duties depend on the destination and change. Check the current duty and any trade-remedy case on hardwood plywood with your customs broker; the EU anti-dumping duty on plywood from China does not apply to plywood made in Vietnam, while the United States has had antidumping and countervailing duty cases on Vietnamese hardwood and decorative plywood. Use the duty table guide and your own broker for the rate that applies on the day.

Related pages
Order, freight and cost guides
Guides on terms, quotes, duties, freight and first-order checks, plus the pages behind the numbers above.
Cost per sheet falls when the container holds more m³: a Styrax core loads about 53 m³ per 40HC against 43 m³ for Eucalyptus (planning table), and Ha Hoa plantation core.
The case for Vietnam, argued from a Ha Hoa, Phu Tho mill: plantation core wood close by, lower labour cost, about 60,000 m³ a year and about 53 m³ of 18 mm Styrax-core.
A guide built around repeat 40HC orders of the same spec: MOQ one 40HC, production 15–45 days after a 30% deposit, the balance against the scanned B/L, FOB Hai Phong.
Score mills on what a buyer can check: annual output (about 60,000 m³), a sheets-per-40HC planning table by core, tolerance written per order at ±0.3–0.5 mm, the.
There is no single number: 40HC fill depends on core density and the 28,000 kg planning payload.
- Chinese birch plywood, Baltic birch or Vietnamese birch-faced: what changes per container
Same birch face, different cores and glue per origin: weight, ply count and m3 per 40HC compared, and why a Vietnamese mill writes core species on the order.
- UK plywood suppliers: merchant stock against a direct Vietnamese container
When a UK buyer moves from merchant stock to a direct 40HC: volume threshold, landed cost steps and lead times.
- When a plywood container hits payload before it is full
In the planning table, Eucalyptus core reaches the 28,000 kg payload at every thickness and stops near 43 m³, while Styrax fills by volume to about 53 m³ at 1220×2440.
- How plywood importers buy from mills, and how to start
The importer's model (specs, containers, stock, credit) and the first steps for a new one.
- Import duty table: what Vietnamese panels pay in each market
Import duty per market with the FTA that lowers it and the origin form that claims it.
- Buying laminated plywood in volume: MOQ, checks before loading and repeat-spec orders
How a high-output plywood mill supplies laminated sheets: one 40HC MOQ, core matched to the laminate, face, bond and flatness checks before loading, private-label.
- Where volume buyers buy plywood: merchant, importer or mill
The three routes compared on price and supply for buyers who need a container or more a month.
- Plywood in Denmark: merchant stock against a direct 40HC
What Danish merchants stock and what a direct container of poplar, pine or laminated ply costs and contains.
- EU panel supply outlook: Vietnamese plywood for EU importers
What EU importers of commercial and furniture panels can expect on supply, rules and price.
The fairs where commercial plywood buyers meet Vietnamese mills, and what to bring.
Which associations commercial plywood buyers deal with and what each one publishes.
- Top plywood producing countries and who imports most
The producing and importing countries and where Vietnam's commercial plywood fits.
What moves world plywood supply and what it means for buyers planning monthly containers.
- Best plywood origin by use: which country fits which panel
Origins matched to furniture, commercial and packing uses so buyers source each spec where it is strongest.
FOB Hai Phong from Ha Hoa: low-cost plantation core wood and labour set the base, then core species, face, tolerance and sheets per 40HC move cost per m³.
From 30 December 2026 the EU importer is the operator and files the DDS.
A mill can price an RFQ in one reply when it starts from the application, then names the core, glue and emission, face and back pair, sheet size, tolerance per order.
Verify what a mill claims before the 30% deposit.
A monthly programme works when the spec stays the same: approved sample, tolerance written on the order and the same core, so each 40HC loads the same count (990 Styrax.
For a US container the mill's part is CARB P2 certified panels, FOB Hai Phong, CFR or CIF terms, draft papers sent for approval after loading, and 20–45 days at sea by.
Every 40HC carries a fixed set: invoice, packing list, B/L, certificate of origin (EUR.1 for EU lots), phyto and fumigation papers and CIF insurance, plus the order's.
Quality depends on the line you order.
A sample is the reference for every repeat container, not a gift.
Minimum order, deposit, balance, delivery terms and documents.
RFQ, samples, deposit, production slot, documents and balance in order.
Pack plan, weighing and sealing; the full planning table.
Sheets, m³ and kg for a mixed order.
What each market requires and what travels with every container.
Laminated plywood price from a Vietnamese mill: how core, sides, laminate, thickness and container fill move the FOB cost per m³ of melamine and HPL panels.
FAQ
Questions on terms, transit and landed cost
How long is sea freight from Hai Phong to Hamburg, Antwerp or Valencia?
Typical days at sea are 30–40 to Northern Europe (Hamburg, Antwerp) and 25–35 to the Mediterranean (Valencia). The range depends on carrier, route and transshipment. Add the production period to get the time from order to discharge.
How many days does a container take from Hai Phong to the US West and East Coasts?
Typically 20–30 days to the US West Coast and 35–45 days to the US East Coast, at sea. The East Coast leg is the longer of the two, and carriers adjust schedules, so ask for the current sailing when you book.
Which delivery terms are quoted, and what does CIF add to the documents?
FOB Hai Phong, CFR (CNF) or CIF. FOB puts the sea freight with the buyer, CFR puts it with the seller, and CIF adds cargo insurance, so an insurance document joins the invoice, packing list, B/L and certificate of origin. Risk passes at loading in all three.
How does core choice change freight cost per m³?
Freight is a price per container, so it is divided by the m³ loaded. At 18 mm a Styrax 40HC holds about 53 m³, Acacia about 47 m³ and Eucalyptus about 43 m³. The same freight rate therefore costs more per m³ on Acacia and Eucalyptus than on Styrax, because the box carries about 47 or 43 m³ instead of 53. These are planning figures.
What US duties apply to hardwood plywood from Vietnam?
Antidumping and countervailing duty cases on hardwood and decorative plywood from Vietnam have reached final determinations, and the rates and the order itself change. Confirm the current rate and the product scope with your customs broker before you fix a landed cost; Truc Mai quotes the plywood, not the duty.
Does the EU anti-dumping duty on Chinese plywood apply to Vietnamese plywood?
No. The EU duty on hardwood plywood applies to plywood made in China. Plywood made in Vietnam is not covered by that regulation, but it still needs the EU file set: the FSC claim, EUDR geolocation data and the packaging test where relevant.
When is the balance paid, and against which document?
The 30% deposit starts production. The 70% balance is due against the scanned B/L, by T/T or irrevocable L/C at sight. Certificate files are sent before the order is confirmed, and draft shipping documents are approved by the buyer after loading.
Is the minimum order one 40HC, and can it hold more than one product?
Yes. The minimum is one 40HC. A container usually carries one or two products, and three to six products can be mixed by agreement, which suits buyers who reorder several panels every month.
Quotation
Ask for a landed-cost quotation
Send core, thickness, sheet size, destination port and terms (FOB, CFR or CIF) and the reply gives the planning load and the production slot.
State core, thickness, sheet size, face and back grade, destination port and delivery terms. The reply gives sheets, m³ and packs per 40HC as a planning figure.