contact@trucmaiplywood.comWhatsApp +84 336 045 338
Truc Mai Plywood logoTruc MaiPlywood · Vietnam
Truc Mai Plywood logoTruc MaiPlywood · Vietnam
Request a quotation
contact@trucmaiplywood.com

Ha Hoa, Phu Tho, Vietnam

Resources · orders, freight and cost

Importing plywood from Vietnam guides: terms, transit days and landed cost by the 40HC

Importing plywood from Vietnam guides start with one fact: a 40HC of Truc Mai plywood is quoted FOB Hai Phong, CFR or CIF. Production takes 15–45 days after a 30% deposit, the sea leg takes 30–40 days to Northern Europe or 35–45 to the US East Coast, and the 70% balance is paid against the scanned B/L. Freight cost per m³ then depends on the core, because Styrax loads about 53 m³ and Eucalyptus about 43.

This hub is for buyers planning monthly containers. It follows one order from RFQ to unloading, gives the days at sea by region, and shows why the same freight rate costs more per m³ on a heavier core. The full terms sit on the MOQ, payment and FOB page; this page does not repeat them in other words.

Close view of okoume face grain texture
Close view of okoume face grain texture
  • 15–45 daysproduction after the 30% deposit
  • 30–40 daysHai Phong to Northern Europe at sea
  • 35–45 daysHai Phong to the US East Coast at sea
  • 53 vs 43 m³18 mm Styrax and Eucalyptus per 40HC

Transit days are typical ranges and vary by carrier and route. Load figures are planning figures.

Importing · orders, freight and cost · 2:22, English captions

Answer and key facts

Importing plywood from Vietnam guides: what a monthly container costs and how long it takes

Four numbers frame a Truc Mai container order: a minimum of one 40HC, 15–45 days of production after the deposit, a sea leg of 5 to 50 days depending on the region, and a landed cost that follows m³ per container. Everything else is the specification.

Prices are quoted per order against the written specification and are not published as a list. What a buyer can compute before asking is the freight share: container freight is charged per box, so it is divided by the m³ the box holds. That is why core choice is a cost line and not only a quality line.

Rules behind the paperwork lines: Regulation (EU) 2023/1115, readable on EUR-Lex, FSC International for the claim on the invoice, and the California Air Resources Board with the US EPA for US-bound panels.

Terms in brief (full text on MOQ, payment and FOB)
LineTruc Mai order
Minimum orderOne 40HC; one or two products usually, three to six by agreement
Production15–45 days after the 30% deposit
Balance70% against the scanned B/L, T/T or irrevocable L/C at sight
Delivery termsFOB Hai Phong, CFR (CNF) or CIF
SamplesFree for repeat buyers and buyers with an order; new buyers book their own courier, credited against a real order

Sequence

From RFQ to unloading: the order in seven steps

The sequence is the same for every container, which is what makes the second and twelfth container faster than the first. Documents and certificates are ready before the order is confirmed.

  1. RFQ with a written specification

    Core, thickness, sheet size, face and back grade, emission class, packing and quantity. The reply gives sheets, m³ and packs per 40HC.

  2. Samples and an approved reference

    Face grade is agreed against the approved sample and written on the order as a pair, face and back.

  3. Order and 30% deposit

    Certificate files are sent before the order is confirmed.

  4. Production

    Time depends on quantity, production conditions and agreement; 4 mm panels can take longer because good thin veneer is scarce.

  5. Loading and sealing

    Packs are built, weighed and loaded; draft shipping documents go to the buyer for approval after loading.

  6. Scanned B/L and 70% balance

    Paid by T/T or irrevocable L/C at sight.

  7. Sea leg and arrival

    Days at sea depend on the region; the buyer checks the container against the reference sample on arrival.

Transit

Importing plywood from Vietnam to USA and Europe: how many days at sea from Hai Phong?

Typical days at sea run from 5 to 12 within South-East Asia up to 35 to 50 to West Africa. Northern Europe takes 30–40 days and the US East Coast 35–45. Carrier, route and transshipment change the figure, so treat the table as a planning range.

Importing plywood from Vietnam to the USA takes 20–30 days at sea to the West Coast and 35–45 to the East Coast, and plywood shipping cost from Vietnam to USA follows the same container maths as every other route. Add the production period to get the time from order to port of discharge. A buyer who orders monthly staggers deposits so that one container is at sea, one is in production and one is being specified.

Typical days at sea from Hai Phong (port to port, excluding production)
RegionDays at sea
South-East Asia5–12
Middle East15–25
US West Coast20–30
Mediterranean (for example Valencia)25–35
Northern Europe (for example Hamburg, Antwerp)30–40
US East Coast35–45
West Africa35–50

Cost

Plywood shipping cost from Vietnam to USA: how core choice changes freight per m³

Container freight is a price per box. Divide it by the m³ in the box and a denser core costs more per m³: at 18 mm a Styrax load of about 53 m³ carries each m³ for less freight per m³ than Acacia (about 47 m³) or Eucalyptus (about 43 m³).

The saving comes from weight. Eucalyptus reaches the 28,000 kg planning payload at 15 packs and Acacia at 16, while Styrax fills the container at 18 packs. A furniture buyer who moves from Acacia to Styrax core usually also gets a better face and a lighter sheet. A worksheet is easy to build: freight quote divided by 53, 47 and 43 gives cost per m³ for each core, before duty and port charges.

Duties depend on the destination and change. Check the current duty and any trade-remedy case on hardwood plywood with your customs broker; the EU anti-dumping duty on plywood from China does not apply to plywood made in Vietnam, while the United States has had antidumping and countervailing duty cases on Vietnamese hardwood and decorative plywood. Use the duty table guide and your own broker for the rate that applies on the day.

FAQ

Questions on terms, transit and landed cost

How long is sea freight from Hai Phong to Hamburg, Antwerp or Valencia?

Typical days at sea are 30–40 to Northern Europe (Hamburg, Antwerp) and 25–35 to the Mediterranean (Valencia). The range depends on carrier, route and transshipment. Add the production period to get the time from order to discharge.

How many days does a container take from Hai Phong to the US West and East Coasts?

Typically 20–30 days to the US West Coast and 35–45 days to the US East Coast, at sea. The East Coast leg is the longer of the two, and carriers adjust schedules, so ask for the current sailing when you book.

Which delivery terms are quoted, and what does CIF add to the documents?

FOB Hai Phong, CFR (CNF) or CIF. FOB puts the sea freight with the buyer, CFR puts it with the seller, and CIF adds cargo insurance, so an insurance document joins the invoice, packing list, B/L and certificate of origin. Risk passes at loading in all three.

How does core choice change freight cost per m³?

Freight is a price per container, so it is divided by the m³ loaded. At 18 mm a Styrax 40HC holds about 53 m³, Acacia about 47 m³ and Eucalyptus about 43 m³. The same freight rate therefore costs more per m³ on Acacia and Eucalyptus than on Styrax, because the box carries about 47 or 43 m³ instead of 53. These are planning figures.

What US duties apply to hardwood plywood from Vietnam?

Antidumping and countervailing duty cases on hardwood and decorative plywood from Vietnam have reached final determinations, and the rates and the order itself change. Confirm the current rate and the product scope with your customs broker before you fix a landed cost; Truc Mai quotes the plywood, not the duty.

Does the EU anti-dumping duty on Chinese plywood apply to Vietnamese plywood?

No. The EU duty on hardwood plywood applies to plywood made in China. Plywood made in Vietnam is not covered by that regulation, but it still needs the EU file set: the FSC claim, EUDR geolocation data and the packaging test where relevant.

When is the balance paid, and against which document?

The 30% deposit starts production. The 70% balance is due against the scanned B/L, by T/T or irrevocable L/C at sight. Certificate files are sent before the order is confirmed, and draft shipping documents are approved by the buyer after loading.

Is the minimum order one 40HC, and can it hold more than one product?

Yes. The minimum is one 40HC. A container usually carries one or two products, and three to six products can be mixed by agreement, which suits buyers who reorder several panels every month.

Quotation

Ask for a landed-cost quotation

Send core, thickness, sheet size, destination port and terms (FOB, CFR or CIF) and the reply gives the planning load and the production slot.

Quotation with landed-cost inputs

State core, thickness, sheet size, face and back grade, destination port and delivery terms. The reply gives sheets, m³ and packs per 40HC as a planning figure.

Contact us

Request a quotation