Mill terms
Minimum order quantity for plywood from Vietnam: one 40HC, then the terms
The minimum order quantity for plywood from Truc Mai is one 40HC. That is about 990 sheets of 18 mm on Styrax core, or 5,994 sheets of 3 mm, as a planning figure. Payment is a 30% deposit and 70% against the scanned B/L, production takes 15–45 days, and delivery is FOB Hai Phong, CFR or CIF.
These terms are the same for every product the mill sells, so product pages link here instead of repeating them. They are written for an importer, wholesaler or furniture maker who buys by the container and wants the second and third order to run on the same lines as the first. The step-by-step order path is on from enquiry to loading.

- 1×40HCminimum order, one or two products, more by agreement
- 30%deposit; 70% against the scanned B/L
- 15–45 daysproduction after the deposit, by quantity
- FOB Hai Phongor CFR / CIF to the buyer's port
Updated 12 November 2026
Terms
Minimum order quantity, plywood, Vietnam: what are the terms of one container?
Full containers direct from the mill; these terms apply unless the contract says otherwise.
Why a full container and not a pallet? The mill presses, sorts and packs by order, and one order fills one box. A smaller lot would carry the same document set, the same inspection and the same trucking to Hai Phong, so its cost per cubic metre would rise for no gain in quality. A full 40HC is also the unit in which a monthly buyer plans: one container, one invoice, one set of papers.
The mill produces around 60,000 m³ a year, about 5,000 m³ in an average month, so a buyer who adds a second or third container a month is planned into the same press schedule rather than queued as a new customer.
- Minimum order One 40HC
- Production time 15–45 days after the 30% deposit, by quantity and agreement
- Payment 30% deposit; 70% against the scanned B/L by T/T, or irrevocable L/C at sight
- Delivery terms FOB Hai Phong, CFR or CIF
- Documents Invoice, packing list, B/L, certificate of origin, phytosanitary, fumigation, order certificates
- Price Quoted per order against the written specification
One 40HC in sheets
How many sheets is one container of plywood at the one-40HC minimum?
At 18 mm and 1220 × 2440 mm, one 40HC holds about 990 sheets on Styrax core, 880 on Acacia or 795 on Eucalyptus. The core sets the count, because a heavier core reaches the weight limit before the box is full.
Every other thickness and the 1250 × 2500 mm sheet are in the 40HC load calculator, and the way packs are built, weighed and stowed is shown in loading a 40HC. For a quotation, state the core and thickness and the sheet count is filled in from the same model.
| Core and thickness | Packs × sheets | Sheets | Volume |
|---|---|---|---|
| Styrax, 18 mm | 18 × 55 | 990 | 53.0 m³ |
| Acacia, 18 mm | 16 × 55 | 880 | 47.2 m³ |
| Eucalyptus, 18 mm | 15 × 53 | 795 | 42.6 m³ |
| Styrax, 12 mm | 18 × 83 | 1,494 | 53.4 m³ |
| Styrax, 9 mm | 18 × 111 | 1,998 | 53.5 m³ |
| Styrax, 3 mm | 18 × 333 | 5,994 | 53.5 m³ |
Sheet counts and weights are planning figures, not a loading record.
Mixed loads
Plywood minimum order 40HC: can one container carry several thicknesses or products?
Yes. A container usually carries one or two products, and three to six products can be mixed by agreement. Thicknesses mix freely inside one product.
Mixing works by pack: each pack holds one product, one thickness and one size, about 1,000 mm high, so the receiving team counts packs, not loose sheets. A common mixed order is two or three thicknesses of the same face, for example carcass panels and thin backs from one furniture range. Panels cut at the mill to the buyer's part sizes can share the box with full sheets.
More products means more press set-ups and more sorting, so a six-product container may sit at the longer end of the 15–45 day range. When the mix is fixed for a monthly programme, the same pack plan is repeated and the second container is faster to schedule than the first.
Payment
How do the 30% deposit and the 70% balance work?
The 30% deposit starts production. The 70% balance is paid against the scanned B/L by T/T, or the whole order runs on an irrevocable L/C at sight.
The scanned B/L proves the goods are on board before the larger share is paid, which protects the buyer; the deposit covers the materials bought for that order, which protects the mill.
- Proforma invoice
The proforma lists every line of the specification: core, face pair, glue and emission class, thickness, tolerance, sheet size, pack plan and price. The buyer checks it before paying anything.
- 30% deposit
The deposit by T/T books press time and veneer. The 15–45 day production period counts from the day it arrives.
- Loading and draft documents
After loading, draft invoice, packing list and B/L go to the buyer for approval, with loading photos.
- 70% balance against the scanned B/L
The buyer pays the balance against a scan of the original B/L, then receives the originals or a telex release. Under an L/C at sight, the bank pays against the documents named in the credit.
Lead time
How long does one container take, and what changes on a monthly programme?
Production takes 15–45 days after the deposit. The range depends on quantity, the number of products in the box, and whether thin or scarce veneer is involved.
A single container of one product sits at the short end. Thin 4 mm panels can take longer, because good thin core veneer is scarce. A repeat order on an approved sample is quicker to start than a first order, since the face pair and the pack plan are already agreed. The detail by quantity is on lead times by volume, and how a fixed monthly call-off is set up is on monthly container programmes.
Sea time comes on top and depends on the carrier and the route. The table gives typical days at sea from Hai Phong.
| Destination region | Days at sea |
|---|---|
| South-East Asia | 5–12 days |
| Middle East | 15–25 days |
| US West Coast | 20–30 days |
| Mediterranean | 25–35 days |
| Northern Europe | 30–40 days |
| US East Coast | 35–45 days |
Delivery terms
What do FOB Hai Phong, CFR and CIF mean for a plywood order?
Under FOB Hai Phong the mill delivers the container on board at Hai Phong and the buyer books the sea freight. Under CFR the mill also pays freight to the buyer's port; under CIF it adds cargo insurance.
FOB suits a buyer with its own forwarder and contract rates. CFR and CIF suit a buyer who wants one price to the port of discharge. In every case the import duty, customs clearance and inland delivery at destination stay with the buyer. The terms follow Incoterms 2020; no other delivery term is offered.
Samples
Are samples free before a first container order?
Samples are free. A new buyer books its own courier, and that courier cost can be credited against a real order; buyers with an order or a repeat programme receive samples without courier cost.
The sample is what the face grade is agreed against. Once approved, it is kept at the mill as the reference for every later container, and the face and back are written on the order as a pair. How to request one, and what to ask for on each piece, is on ordering samples.


Documents and price
Which documents come with the order, and how is the price set?
Each container ships with invoice, packing list, B/L, certificate of origin, phytosanitary and fumigation papers, plus the certificate files that belong to the order. The price is quoted per order against the written specification.
The certificate files are sent before the order is confirmed: FSC 100% under FSC-C196493 for products on the schedule, and the CARB P2 and TSCA Title VI certificate for 3–25 mm veneer-core panels. EU-bound lots add an EUR.1 certificate of origin and the data set for the EUDR regulation. The FSC code can be checked in the FSC certificate database and the US rule read in the EPA formaldehyde rule. What each paper proves is on certificate files; the full list by stage is on papers per container.
There is no price list. Two quotes with the same product name often differ in core grade, joining, face preparation, glue and tolerance, so the price is fixed against those lines, including a thickness tolerance of ±0.3–0.5 mm written per order.
Go deeper
Where each part of the order is explained in full
The order path step by step, from the first RFQ to the sealed container.
How packs are built, weighed and stowed, with the full planning table.
Sheets, m³ and kg for every core, size and thickness.
What moves an order inside the 15–45 day range.
A fixed call-off on one approved spec.
The four certificates and the file set per order.
Guides on pricing, freight and landed cost.
FOB price to landed cost, line by line.
FAQ
Questions on the container minimum and the terms
What is the minimum order quantity for plywood from Vietnam at Truc Mai?
One 40HC. It can hold one product or a mix of thicknesses, and three to six products by agreement. At 18 mm on Styrax core that is about 990 sheets as a planning figure.
How many sheets make up the one-40HC minimum at 18 mm?
About 990 sheets on Styrax core, 880 on Acacia and 795 on Eucalyptus, all 1220 × 2440 mm. These are planning figures from the packing model, panels only; real sheets are weighed before final loading.
Can a first order mix thicknesses in one container?
Yes. Each pack holds one thickness, so a first container can carry two or three thicknesses of the same product. Mixing three to six different products is agreed case by case.
What payment terms apply after the 30% deposit?
The 70% balance is paid by T/T against a scan of the original B/L, after the buyer has approved the draft documents. Alternatively the order runs on an irrevocable L/C at sight.
How long is production for one container compared with a monthly programme?
One container takes 15–45 days after the deposit, depending on quantity and the number of products. On a monthly programme the face pair and pack plan are already approved, so each repeat container starts without sampling.
Are samples free before a first order?
Yes. A new buyer pays only its own courier, and that cost can be credited against a real order. Buyers with an order or a repeat programme get samples without courier cost.
Is the price fixed before the deposit?
Yes. The price is quoted against the written specification and stands on the proforma invoice that the deposit pays. There is no price list, because core, glue, face and tolerance change the price.
Who books the ship under FOB Hai Phong?
The buyer or its forwarder books the sea freight, and the mill delivers the loaded container on board at Hai Phong. Under CFR or CIF the mill books the freight to the port named by the buyer.
Quotation
Send the specification for one container
Core, thickness, face pair, glue and emission class, sheet size, quantity and delivery term are enough for a priced container quotation.
Name the products, thicknesses and the port. The reply comes with the sheet count, the price and the production window.